Page
TABLE OF CONTENTS
1 |
|
1 |
1.1 |
Basic Project Information |
1 |
1.2 |
Project Organization |
2 |
1.3 |
Construction
Programme |
2 |
1.4 |
Construction
Works Undertaken During the Reporting Period |
2 |
|
|
|
|
|
|
2 2.0 |
|
3 |
2.1 |
Summary of EM&A Requirements |
3 |
2.2 |
Monitoring
Requirements |
3 |
2.3 |
Action and Limit Levels |
4 |
2.4 |
Event Action Plans |
4 |
2.5 3 |
Mitigation Measures NOISE MONITORING |
4 |
|
|
|
|
|
|
3 2.0 |
Environmental
monitoring and audit |
5 |
3.1 |
Air Quality Monitoring Results |
5 |
3.2 |
Noise Monitoring Results |
5 |
3.3 |
Implementation Status of Environmental Mitigation
Measures |
5 |
3.4 |
Advice on the Solid and Liquid Waste
Management Status |
5 |
3.5 |
Environmental Licenses and Permits |
6 |
|
|
|
|
|
|
4 |
Summary of Exceedance, Complaint, notification of summons and
sucessful prosecution |
6 |
|
||
4.1 |
Summary of Exceedance of the
Environmental Quality Performance Limit |
6 |
4.2 |
Summary of Complaints, Notification of Summons
and Successful Prosecution |
6 |
|
|
|
|
|
|
5 |
7 |
|
5.1 |
Comments |
7 |
5.2 |
Recommendations |
7 |
5.3 |
Conclusions |
7-8 |
|
||
Figure 2A |
Air Quality and Noise Monitoring Stations for
HKBCF (Before 05 February 2015) |
Figure 2 |
Air Quality and Noise Monitoring Stations for
HKBCF (Started from 05 February 2015) |
|
|
APPENDICES |
|
Location of Works Areas |
|
Project Organization for Environmental Works |
|
Construction Programme |
|
Event and Action Plan |
|
Implementation Schedule for Environmental Mitigation Measures (EMIS) |
|
Site Audit Findings and Corrective Actions |
|
Waste Flow Table |
|
Environmental Licenses and Permits |
|
Statistics on Environmental Complaints, Notification of Summons and Successful
Prosecutions |
This Quarterly Environmental Monitoring and Audit (EM&A) Report is prepared for Contract
HY/2013/02 Hong Kong¡VZhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities
(HKBCF) ¡V Infrastructure Works Stage I (Western Portion) (hereafter referred to
as ¡§the Contract¡¨) for the Highways Department of Hong Kong Special
Administrative Region (HKSAR). The Contract was awarded to China Harbour
Engineering Co., Ltd. (hereafter referred to as ¡§the Contractor¡¨) and ETS-Testconsult
Limited was appointed as the Environmental Team (ET) by the Contractor.
The
Contract is part of Hong Kong ¡V Zhuhai ¡V Macao Bridge HKBCF which is a
¡§Designated Project¡¨, under Schedule 2 of the Environmental Impact Assessment
Ordinance (EIAO) (Cap 499) and Environmental Impact Assessment (EIA) Report
(Register No. AEIAR-145/2009) was prepared for the Project. The
current Environmental Permit (EP) No. EP-353/2009/H for HKBCF was issued
on 19 January 2015. These documents are available through the EIA Ordinance Register.
Site preparation works of the Contract was started on 25 July 2014 and the
construction works of the Contract commenced on 24 November 2014.
ETS-Testconsult Limited has been appointed by the Contractor to
implement the Environmental Monitoring & Audit (EM&A) programme for the
Contract in accordance with the Updated EM&A Manual for HKBCF (Version 1.0)
and provide environmental team services to the Contract.
This is the first Quarterly Environmental Monitoring and
Audit (EM&A) Report for the Contract which summaries findings of the EM&A
works conducted during the reporting period from 24 November
2014
to 28 February 2015.
Environmental Monitoring and
Audit Progress
The EM&A programme was undertaken in accordance with the Updated EM&A
Manual for HKBCF (Version 1.0). It should be noted that the air quality and
noise monitoring works for the Contract are covered by Contract No. HY/2010/02 Hong Kong-Zhuhai-Macao Bridge HKBCF ¡V Reclamation Works
and Contract No. HY/2011/03 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link
Road ¡V Section between Scenic Hill and HKBCF. The ET of the Contract or another
ET of the HZMB project is required to conduct impact air quality monitoring at
AMS6 and AMS7 (replaced by AMS7A from 05 February 2015) and noise monitoring at
NMS2 and NMS3B as part of EM&A programme if these monitoring stations are
no longer covered under Contract No. HY/2010/02 and
HY/2011/03. However, this is subject to ENPO¡¦s final decision on which
ET should carry out the monitoring works at these stations.
The dates of environmental site
inspections during the reporting period are listed below:
Environmental Site Inspection
Date |
|||
November 2014 |
December 2014 |
January 2015 |
February 2015 |
25 |
02,09,19,23 and 30 |
06,16,20 and 27 |
03,13,17 and 24 |
Breaches of Action and
Limit Levels
There was no Action and Limit Level exceedance
of 1-hr TSP level and 24-hr TSP
level recorded at station AMS6 by the Environmental Team of
Contract No. HY/2011/03 during the reporting period.
There was no
Action and Limit Level exceedance of 1-hr
TSP level and 24-hr TSP level recorded at station AMS7 and then
station AMS7A (started from 05 February 2015) by the Environmental Team of
Contract No. HY/2010/02 during the reporting period.
There was no
Action and Limit Level exceedance for
noise recorded at station NMS2 and station NMS3B by the
Environmental Team of Contract No. HY/2010/02 during the reporting period.
Implementation of Environmental
Measures
Site
inspections were carried out on a weekly basis to monitor the implementation of
proper environmental pollution control and mitigation measures for the Project.
Potential environmental impacts due to the construction activities were
monitored and reviewed.
Complaint Log
There
was no complaint received in relation to the environmental impact during the reporting period.
Notifications of Summons and
Successful Prosecutions
There
were no notification of summon or prosecution received during the reporting period.
Reporting
Change
There was no reporting change in the reporting period.
1.1 Basic Project
Information
1.2 Project Organization
Table 1.1 Contact Information of Key Personnel
Party |
Position |
Name of Key Staff |
Tel. No. |
Fax No. |
Engineer or Engineer¡¦s Representative
(AECOM Asia Co. Ltd.) |
Resident Engineer |
Mr. Fred Yeung |
63308293 |
31525116 |
Environmental
Project Office / Independent Environmental Checker (Environ Hong Kong
Limited) |
Environmental Project Office Leader |
Mr. Y. H. Hui |
34652888 |
34652899 |
Independent Environmental Checker |
Mr. Raymond Dai |
34652888 |
34652899 |
|
Environmental Site Supervisor |
Mr. Ray Yan |
51818165 |
34652899 |
|
Contractor (China Harbour Engineering Co., Ltd.) |
Environmental Officer |
Mr. K. F. Wong |
93724383 |
39150300 |
Environmental Engineer |
Mr. Calvin So |
97246254 |
39150300 |
|
Environmental Supervisor |
Ms. Joy Chan |
54005086 |
39150300 |
|
Environmental Supervisor |
Ms. Selena Yang |
55122662 |
39150300 |
|
Environmental Team
(ETS-Testconsult Ltd.) |
Environmental Team Leader |
Mr C. L. Lau |
2946 7791 |
2695 3944 |
1.3 Construction Programme
1.4 Construction
Works Undertaken During the Reporting Period
¡± Pre-Drilling Work at Main Site;
¡± Bored Piles Works at Main Site;
¡± Secondary site office erection at Main Site; and
¡± Storm & Sewer Drain Works at
Main Site.
¡± Trail pit at Portion I.
2.1
Summary of EM&A Requirements
Table
2.1
Summary of Impact
EM&A Requirements
Environmental Monitoring |
Identification No. |
Location Description |
Air Quality |
AMS6(1) |
Dragonair / CNAC
(Group) Buidling |
AMS7(4) |
Hong Kong SkyCity
Marriott Hotel |
|
AMS7A(1) |
Chu Kong
Air-Sea Union Transportation Co. Ltd |
|
Noise |
NMS2(2) |
Seaview Crescent |
NMS3B(2)(3) |
Site Boundary
of Site Office Area at Works Area WA2 |
Remarks:
(1) The ET of this Contract should
conduct impact air quality monitoring at the AMS listed in the table as part of
EM&A programme according to latest notification from ENPO when the monitoring
station(s) is/are no longer covered by another ET of the HZMB project.
(2) The ET of this Contract should
conduct impact noise monitoring at the NMS listed in the table as part of
EM&A programme according to latest notification from ENPO when the
monitoring station(s) is/are no longer covered by another ET of the HZMB
project.
(3) The Action and Limit Levels for
schools will be applied for this alternative monitoring location.
(4) The station AMS7 was
replaced by station AMS7A started from 05 February 2015.
2.2 Monitoring
Requirements
2.3 Action
and Limit Levels
Table
2.2 Action and Limit Levels for 1-hour TSP
Monitoring Station. |
Action Level,mg/m3 |
Limit
Level,mg/m3 |
AMS6 ¡V Dragnair
/ SNAC (Group) Building (HKIA) |
360 |
500 |
AMS7 - Hong Kong SkyCity
Marriott Hotel |
370 |
500 |
AMS |
370 |
500 |
Table
2.3 Action and Limit Levels for 24-hour TSP
Monitoring Station. |
Action Level,mg/m3 |
Limit
Level,mg/m3 |
AMS6 ¡V Dragnair
/ SNAC (Group) Building (HKIA) |
173 |
260 |
AMS7 - Hong Kong SkyCity
Marriott Hotel |
183 |
260 |
AMS |
183 |
260 |
2.3.2 If exceedance(s) at these station(s) is/are
recorded by the ET of the Contract or referred by the other ET under the HZMB
project to the Contract, the ET of the Contract will carry out an investigation
and findings will be reported in the quarterly EM&A Report.
2.3.3 The Action and Limit Levels for construction
noise are provided in Table 2.4
Table 2.4 Action and Limit Levels for Construction
Noise
Parameter |
Action Level |
Limit Level |
07:00
¡V 19:00 hours on normal weekdays |
When one
documented complaint is received |
75
dB(A)* |
|
Notes:
If works are to be carried out during restricted hours, the conditions stipulated in the construction noise permit issued by the Noise Control Authority have to be followed.
* Reduce
to 70
dB(A) for schools and 65 dB(A) during school examination period.
2.3.4 If exceedance(s) at these station(s) is/are
recorded by the ET of the Contract or referred by the other ET under the HZMB
project to the Contract, the ET of the Contract will carry out an investigation
and findings will be reported in the quarterly EM&A Report.
2.4 Event
Action Plans
2.5 Mitigation Measures
2.5.1 Environmental mitigation measures for the Contract
were recommended in the Approved EIA Report. Appendix E lists the
recommended mitigation measures and the implementation status
3 Environmental
Monitoring and Audit
3.1 Air
Quality Monitoring Results
3.2 Noise Monitoring Results
3.2.2 There was no
exceedance for noise recorded at station NMS2 and station NMS3B by the Environmental
Team of Contract No. HY/2010/02 during the reporting period.
3.3
Implementation of Environmental Measures
3.3.1 In
response to the site audit findings, the Contractor carried out corrective
actions. Details of site audit findings and the corrective actions during the
reporting period are presented in Appendix F.
3.3.2 The Contractor waters 8 times per day on all
exposed soil within the project site and associated works areas when
construction activities are being undertaken.
3.3.3 A summary of the Implementation Schedule of
Environmental Mitigation Measures (EMIS) is presented in Appendix E.
Most of the necessary mitigation measures were implemented properly.
3.4 Advice
on the Solid and Liquid Waste Management Status
3.4.1 The Contractor
registered as a chemical waste producer for the Contract. Sufficient numbers of
receptacles were available for general refuse collection and sorting.
3.4.2 No generation of
excavated sediment for treatment during this reporting period.Excavated
marine sediment will be treated using cement solidification/stabilization
(Cement S/S) techniques and will be reused onsite for either backfilling or
landscaping (e.g. berm material).
3.4.3 The summary of waste
flow table is detailed in Appendix G.
3.4.4 The Contractor was reminded that chemical
waste containers should be properly treated and stored temporarily in
designated chemical waste storage area on site in accordance with the Code of
Practise on the Packing, Labelling and Storage of Chemical Waste.
3.5 Environmental
Licenses and Permits
3.5.1 The valid environmental licenses and permits
during the reporting period are summarized in Appendix H.
4 Summary
of exceedance, complaint, notification of summons and successful prosecution
4.1
Summary of Exceedance of the Environmental Quality Performance Limit
4.2 Summary of Complaints, Notification
of Summons and Successful Prosecution
5 Comments,
recommendations and conclusion
5.1 Comments
5.1.1 According to
the environmental site inspection undertaken during the reporting period, the
following recommendations were provided:
n The
Contractor was reminded to provide drip tray for the
chemical container
n The
Contractor was reminded to provide chemical waste storage for the
oil containers.
n The
Contractor was reminded to divert the discharge to
sedimentation tank or improve the drainage of the work site
n The
Contractor was reminded to clean the contaminated oil of
the temporary
wastewater storage
n The Contractor
was reminded to provide water spraying for the haul road regularly to prevent
fugitive dust emission
n The
Contractor was reminded to provide chemical
container for the chemical bottles storage
n The
Contractor was reminded to cover the stockpile to prevent fugitive dust
emission
n The
Contractor was reminded to update the EP version 353/2009/G
to 353/2009/H
n The
Contractor was reminded to clean the accumulated water
5.1.2 A summary of the Implementation Schedule of
Environmental Mitigation Measures (EMIS) is presented in Appendix E.
Most of the necessary mitigation measures were implemented properly.
5.2 Recommendations
5.2.1 With
implementation of the recommended environmental mitigation measures, the
contract¡¦s environmental impacts were considered environmentally acceptable.
The weekly environmental site inspections ensured that all the environmental mitigation
measures recommended were effectively implemented.
5.2.2 The
recommended environmental mitigation measures, as included in the EM&A
programme, effectively minimize the potential environmental impacts from the Contract.
Also, the EM&A programme effectively monitored the environmental impacts
from the construction activities and ensure the proper implementation of
mitigation measures. No particular recommendation was advised for the
improvement of the programme.
5.3 Conclusions
5.3.1 The site preparation work of the Contract was
started on 25 July 2014 and the construction works of the Contract commenced on
24 November 2014. This is the first Quarterly EM&A Report which summaries findings of the EM&A works during the
reporting period from 24 November 2014 to 28 February 2015.
5.3.2 There was no Action and Limit Level exceedance
of 1-hr TSP level and 24-hr TSP level recorded
at station AMS6 by the Environmental Team of Contract No. HY/2011/03 during the reporting period
5.3.3 There was no Action and Limit Level exceedance
of 1-hr TSP level and 24-hr TSP level
recorded at station AMS7 and then station AMS
5.3.4 There was no Action and Limit Level exceedance
for noise recorded at
station NMS2 and station NMS3B by the Environmental Team of Contract No.
HY/2010/02 during the reporting period.
5.3.5 Environmental site inspections were carried out on
25 November 2014, 02, 09, 19, 23, 30 December 2014, 06, 16, 20, 27
January 2015 and 03, 13, 17 and 24 February 2015. Recommendations on remedial
actions were given to the Contractors for the deficiencies identified during
the site inspections.
5.3.6 There were no complaints
received during the reporting period
5.3.7 No notification of
summons and successful prosecution was received during the reporting period.