This
Monthly Environmental Monitoring and Audit (EM&A) Report is prepared for
Contract No. HY/2019/01 ¡§Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary
Crossing Facilities ¡V Phase 2 and Other Works¡¨ (hereafter referred to as ¡§the
Contract¡¨) for the Highways Department of Hong Kong Special Administrative
Region (HKSAR). Contract No. HY/2019/01 was awarded to China Harbour
Engineering Co. Limited and Fugro Technical Services
Limited (FTS) was appointed as the Environmental Team (ET) by the Contractor.
Contract
No. HY/2019/01 is part of the ¡§Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary
Crossing Facilities¡¨ (HZMB HKBCF) Project which is a ¡§Designated Project¡¨ under
Schedule 2 of the Environmental Impact Assessment (EIA) Ordinance (Cap. 499)
and for which an EIA Report (Register No. AEIAR-145/2009) was prepared and
approved. The current Environmental Permit (EP) for HKBCF, namely No.
EP-353/2009/K, was issued on 11 April 2016. These documents are available
through the EIA Ordinance Register. Commencement of the Contract took place on
4 December 2019 and the construction site preparation works commenced in early February
2020.
Fugro Technical Services Limited (FTS) has
been appointed by the Contractor to implement the Environmental Monitoring
& Audit (EM&A) programme for the Contract in accordance with the
Updated EM&A Manual for HKBCF (Version 1.0) and is providing environmental
team services for the Contract.
This
is the 18th Monthly EM&A Report for the Contract which summaries findings
of the EM&A programme during the reporting period from 1 July 2021 to 31 July
2021.
Environmental
Monitoring and Audit Progress
The
monthly EM&A programme was undertaken in accordance with the Updated
EM&A Manual for HKBCF (Version 1.0). It should be noted that the air
quality, noise and the post-construction dolphin monitoring works for the
Contract are covered by Contract No. HY/2019/01 ¡§Hong Kong-Zhuhai-Macao Bridge
Hong Kong Boundary Crossing Facilities ¡V Phase 2 and Other Works¡¨. The ET of
the Contract or another ET of the HZMB project is required to conduct impact
air quality monitoring at AMS6 as part of EM&A programme if the impact air
quality monitoring work is no longer covered by Contract No. HY/2011/03
respectively. However, this is subject to ENPO¡¦s final decision on which ET
should carry out the monitoring work at these stations.
Breaches
of Action and Limit Levels
No
Action and Limit Level exceedance was recorded for air quality monitoring in
the reporting month. Also, no Action and Limit Level exceedance was recorded for
construction noise monitoring in the reporting month.
Complaint
Log
No
complaints were received in the reporting period.
Notifications
of any Summons and Successful Prosecutions
No
notifications of summons and prosecutions were received in the reporting
period.
Reporting
Change
There
were no reporting changes during the reporting month.
Future
Key Issues
The
main works will be anticipated in the next reporting period are as follow:
¡P
Excavation at Vehicle Clearance Plaza
(VCP) (land-based);
¡P
Road & Drain works at South Public
Transport Interchanges (SPTI), North Public Transport Interchanges (NPTI) and Vehicle Clearance Plaza (VCP) (land-based);
¡P
Covered Walkway at South Public
Transport Interchanges (SPTI) and North Public Transport Interchanges (NPTI)
(land-based);
¡P
Public Toilet at North Public
Transport Interchanges (NPTI) (land-based);
¡P
Kiosks Construction at Vehicle
Clearance Plaza (VCP) (land-based);
¡P
Landscape Works at G1 and G5
(land-based);
¡P
Conceal Conduits Works at Vehicle Clearance
Plaza (VCP) (land-based);
¡P
E&M Works at South Public Transport Interchanges (SPTI)
(land-based);
¡P
Irrigation System at G1 and G5
(land-based).
Contents
6. ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE
7. IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION
MEASURE
Tables
Table 1.1 Contact Information of Key Personnel
Table 1.2
Environmental Licenses, Notification and Permits Summary
Table 2.1
Air Quality Monitoring Equipment
Table 2.2
Air Quality Monitoring Location
Table 2.3
Summary of Air Quality Monitoring Results
Table 3.1
Construction Noise Monitoring Equipment
Table 3.2 Monitoring
Parameters and Frequencies of Noise Monitoring
Table 3.3
Construction Noise Monitoring Location
Table 3.4
Summary of Construction Noise Monitoring Results
Figure
Figure 1 The Site Layout Plan of the Contract
Figure 2 The Location of the Air Quality
Monitoring Station
Figure 3 The Location of the Noise Monitoring
Station
Figure 4 Post-Construction Dolphin Monitoring
Line Transect Layout Map
Appendices
Appendix A Construction Programme
Appendix B Project
Organization Chart
Appendix C Action
and Limit Levels
Appendix D Calibration
Certificate of Monitoring Equipment
Appendix E Environmental
Monitoring Schedule
Appendix F Air
Quality Monitoring Results and Construction Noise Monitoring Results
Appendix H Event
and Action Plan
Appendix J Implementation
Status of Environment Mitigation Measures (Construction Phase)
Appendix K Weather
and Meteorological Conditions during Reporting Month