Contents

1.     Introduction  3

2.     Project Description  6

3.     Project Organisation  8

4.     Environmental Submission  11

5.     Air Quality  13

6.     NOISE  22

7.     SEDIMENT QUALITY  27

8.     WASTE MANAGEMENT  28

9.     WATER QUALITY  31

10.   ECOLOGY  34

11.   FISHERIES  39

12.   CULTURAL HERITAGE  40

13.   HAZARD TO LIFE  41

14.   LANDSCAPE & VISUAL IMPACT  42

15.   SITE ENVIRONMENTAL AUDIT  47

16.   REPORTING   50


Appendices

Appendix A: Tentative Construction Programme

Appendix B:  Environmental Mitigation Implementation Schedule

Appendix C: Project Organization for Environmental Works

Appendix D: Sample Data Sheet for Monitoring

Appendix E: Sample Template for Interim Notification of Exceedance

Figures in the Main Text

Figure 1.1: Site Layout Plan

Figure 1.2: Layout Plan of the Main Works Site

Figure 1.3: Layout Plan of Works Area WA3

Figure 5.1: Location of Air Quality Monitoring Stations

Figure 6.1: Location of Noise Monitoring Stations