TABLE OF
CONTENTS
Introduction
Environmental
Monitoring and Audit Progress
Breaches
of Action and Limit Levels
Future
Key Issues
Purpose
of the report
Structure
of the report
Background
Contract
Organisation
Construction
Programme
Summary
of Construction Works Undertaken During Reporting Month
Status
of Environmental Licences, Notification and Permits
Monitoring
Requirements
Monitoring
Location
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedure
1-hour
and 24-hour TSP Air Quality Monitoring
Instrumentation
HVS
Installation
Filters
Preparation
Operating/Analytical
Procedures
Results
and Observations
Event
and Action Plan
Monitoring
Requirements
Monitoring
Location
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedures
Maintenance
and Calibration
Results
and Observations
Event
and Action Plan
Monitoring
Requirements
Monitoring
Locations
Monitoring
Equipment
Monitoring
Parameters, Frequency
Monitoring
Methodology
Instrumentation
Operating/Analytical
Procedures
Laboratory
Analytical Methods
QA/QC
Requirements
Maintenance
and Calibration
Results
and Observations
Event
and Action Plan
Monitoring
Requirements
DOLPHIN
MONITORING (LINE-TRANSECT VESSEL SURVEY)
Monitoring
Requirements
Monitoring
Location
Monitoring
Frequency
Monitoring
Day
Monitoring
Results
ADDITIONAL
LAND-BASED DOLPHIN BEHAVIOUR AND MOVEMENT MONITORING
7 ENVIRONMENTAL
SITE INSPECTION
Site
Audits
Implementation
Status of Environmental Mitigation Measures
Advice
on the Solid and Liquid Waste Management Status
8 ENVIRONMENTAL
NON-CONFORMANCE (EXCEEDANCES)
Summary
of Exceedances
Summary
of Notification of Summons and Successful Prosecution
Key
Issues in the Coming Month
Monitoring
Schedule for the Next Month
Construction
Programme for the Next Month
10 CONCLUSIONS AND
RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table I Summary
Table for Monitoring Activities in the Reporting Month
Table II Summary
Table for Events Recorded in the Reporting Month
Table 2.1 Key
Contacts of the Contract
Table 2.2 Status
of Environmental Licences, Notification and Permits
Table 3.1 Location
for Air Quality Monitoring Locations
Table 3.2 Air
Quality Monitoring Equipment
Table 3.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 3.4 Summary Table of 1-hour TSP Monitoring Results during the
Reporting Month
Table 3.5 Summary
Table of 24-hour TSP Monitoring Results during the Reporting Month
Table 3.6 Observation
at Dust Monitoring Stations
Table 4.1 Location
for Noise Monitoring Locations
Table 4.2 Noise
Monitoring Equipment
Table 4.3 Noise
Monitoring Parameters, Frequency and Duration
Table 4.4 Summary
Table of Noise Monitoring Results during the Reporting Month
Table 4.5 Observation
at Noise Monitoring Stations
Table 5.1 Location
for Marine Water Quality Monitoring Locations
Table 5.2 Water
Quality Monitoring Equipment
Table 5.3 Water
Quality Monitoring Parameters and Frequency
Table 5.4 Methods
for Laboratory Analysis for Water Samples
Table 5.5 Summary
of Water Quality Exceedances
Table 6.1 Co-ordinates
of transect lines in WL survey area
Table 6.2 Dolphin
encounter rates (sightings per 100 km of survey effort) in March¡¯s surveys
Table 7.1 Observations
and Recommendations of Site Audit
LIST OF FIGURE
Figure 2 Project
Organisation for Environmental Works
Figure 3 Locations
of Air Quality, Noise and Wind Monitoring Stations
Figure 4 Locations
of Water Quality Monitoring Stations
LIST OF
APPENDICES
Appendix A Construction
Programme
Appendix B Action
and Limit Levels
Appendix C Copies
of Calibration Certificates
Appendix D Environmental
Monitoring Schedules
Appendix E 1-hour TSP Monitoring Results
Appendix F 24-hour
TSP Monitoring Results
Appendix G Noise
Monitoring Results
Appendix H Water Quality Monitoring Results and
Graphical Presentations (DO, Turb & SS)
Appendix I Dolphin
Monitoring Report (Line Transect)
Appendix L Summary
of Exceedance
Appendix N Updated
Environmental Mitigation Implementation Schedule
Appendix O Waste
Generation in the Reporting Month
Appendix Q Summary of Successful
Prosecutions