TABLE OF CONTENTS
Introduction
Environmental Monitoring and Audit
Progress
Breaches of Action and Limit Levels
Future Key Issues
Purpose of the report
Structure of the report
Background
Contract Organisation
Construction Programme
Summary of Construction Works Undertaken
During Reporting Month
Status of Environmental Licences,
Notification and Permits
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC
Procedure
1-hour and 24-hour TSP Air Quality
Monitoring
Instrumentation
HVS Installation
Filters Preparation
Operating/Analytical Procedures
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC
Procedures
Maintenance and Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency
Monitoring Methodology
Instrumentation
Operating/Analytical Procedures
Laboratory Analytical Methods
QA/QC Requirements
Maintenance and Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
DOLPHIN MONITORING (LINE-TRANSECT VESSEL
SURVEY)
Monitoring Requirements
Monitoring Location
Monitoring Frequency
Monitoring Day
Monitoring Results
ADDITIONAL LAND-BASED DOLPHIN BEHAVIOUR
AND MOVEMENT MONITORING
7 ENVIRONMENTAL
SITE INSPECTION
Site Audits
Implementation Status of Environmental
Mitigation Measures
Advice on the Solid and Liquid Waste
Management Status
8 ENVIRONMENTAL
NON-CONFORMANCE (EXCEEDANCES)
Summary of Exceedances
Summary of Notification of Summons and
Successful Prosecution
Key Issues in the Coming Month
Monitoring Schedule for the Next Month
Construction Programme for the Next
Month
10 CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table I Summary
Table for Monitoring Activities in the Reporting Month
Table II Summary
Table for Events Recorded in the Reporting Month
Table 2.1 Key
Contacts of the Contract
Table 2.2 Status
of Environmental Licences, Notification and Permits
Table 3.1 Location
for Air Quality Monitoring Locations
Table 3.2 Air
Quality Monitoring Equipment
Table 3.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 3.4 Summary
Table of 1-hour TSP Monitoring Results during the Reporting Month
Table 3.5 Summary
Table of 24-hour TSP Monitoring Results during the Reporting Month
Table 3.6 Observation
at Dust Monitoring Stations
Table 4.1 Location
for Noise Monitoring Locations
Table 4.2 Noise
Monitoring Equipment
Table 4.3 Noise
Monitoring Parameters, Frequency and Duration
Table 4.4 Summary
Table of Noise Monitoring Results during the Reporting Month
Table 4.5 Observation
at Noise Monitoring Stations
Table 5.1 Location
for Marine Water Quality Monitoring Locations
Table 5.2 Water
Quality Monitoring Equipment
Table 5.3 Water
Quality Monitoring Parameters and Frequency
Table 5.4 Methods
for Laboratory Analysis for Water Samples
Table 5.5 Summary
of Water Quality Exceedances
Table 6.1 Co-ordinates
of transect lines in WL survey area
Table 6.2 Dolphin
encounter rates (sightings per 100 km of survey effort) in June¡¯s surveys
Table 7.1 Observations
and Recommendations of Site Audit
LIST OF FIGURE
Figure 2 Project
Organisation for Environmental Works
Figure 3 Locations
of Air Quality, Noise and Wind Monitoring Stations
Figure 4 Locations
of Water Quality Monitoring Stations
LIST OF APPENDICES
Appendix
A Construction
Programme
Appendix
B Action
and Limit Levels
Appendix
C Copies
of Calibration Certificates
Appendix
D Environmental
Monitoring Schedules
Appendix
E 1-hour
TSP Monitoring Results
Appendix
F 24-hour
TSP Monitoring Results
Appendix
G Noise
Monitoring Results
Appendix H Water
Quality Monitoring Results and Graphical
Presentations (DO, Turb & SS)
Appendix I Dolphin
Monitoring Report (Line Transect)
Appendix
L Summary
of Exceedance
Appendix
N Updated
Environmental Mitigation Implementation Schedule
Appendix
O Waste
Generation in the Reporting Month
Appendix Q Summary
of Successful Prosecutions