CONTENTS
1.1 Background
1.2 Project Description
1.3 Project Organisation
1.4 Construction Programme
1.5 Construction Works undertaken during the Reporting Period
2.1 Monitoring Locations
2.2 Monitoring Requirements
2.3 Monitoring Results
3.1 Monitoring Locations
3.2 Monitoring Requirements
3.3 Monitoring Results
4.1 Monitoring Locations
4.2 Monitoring Requirements
4.3 Monitoring Results
5.1 Monitoring Locations
5.2 Monitoring Requirements
5.3 Monitoring Results
6.
DISPOSAL OF MARINE SEDIMENT EXTRACTED FROM BORED PILING WORKS
6.1 Background
6.2 Dumping Arrangements
6.3 Quantity Disposed
7.
ENVIRONMENTAL SITE INSPECTION AND AUDIT
7.1 Site Inspection
7.2 Advice on the Solid and Liquid Waste Management Status
7.3 Environmental Licenses and Permits
7.4 Implementation Status of Environmental Mitigation Measures
7.5 Summary of Exceedance of the Environmental Quality Performance Limit
7.6 Summary of Complaints, Notification of Summons and Successful Prosecution
8.1 Construction Programme for the Coming Months
8.2 Environmental Site Inspection Schedule for the Coming Month
APPENDICES
B Project Organization
for Environmental Works
F Environmental Licenses and
Permits
G
Implementation Schedule for Environmental Mitigation Measures (EMIS)
H
Statistics on Environmental Complaints, Notification of Summons and Successful
Prosecutions
I
Environmental Site Inspection Schedule
J Investigation Reports
on Action Level or Limit Level Non-compliance
FIGURES
Figure
1
Air Quality Monitoring Stations
Figure
2
Noise Monitoring Stations
Figure
3
Water Quality Monitoring Stations
Figure
4
Ecological Monitoring Transect Line and Layout Map