
TABLE
OF CONTENTS
Introduction
Environmental Monitoring and Audit
Progress
Breaches of Action and Limit Levels
Future Key Issues
Purpose of the report
Structure of the report
Background
Contract Organisation
Construction Programme
Summary of Construction Works Undertaken
During Reporting Month
Status of Environmental Licences,
Notification and Permits
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC
Procedure
1-hour and 24-hour TSP Air Quality
Monitoring
Instrumentation
HVS Installation
Filters Preparation
Operating/Analytical Procedures
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC
Procedures
Maintenance and Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency
Monitoring Methodology
Instrumentation
Operating/Analytical Procedures
Laboratory Analytical Methods
QA/QC Requirements
Maintenance and Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
DOLPHIN MONITORING (LINE-TRANSECT VESSEL
SURVEY)
Monitoring Requirements
Monitoring Location
Monitoring Frequency
Monitoring Day
Monitoring Results
ADDITIONAL LAND-BASED DOLPHIN BEHAVIOUR
AND MOVEMENT MONITORING
7 ENVIRONMENTAL
SITE INSPECTION
Site Audits
Implementation Status of Environmental
Mitigation Measures
Advice on the Solid and Liquid Waste
Management Status
8 ENVIRONMENTAL
NON-CONFORMANCE (EXCEEDANCES)
Summary of Exceedances
Summary of Notification of Summons and
Successful Prosecution
Key Issues in the Coming Month
Monitoring Schedule for the Next Month
Construction Programme for the Next
Month
10 CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF
TABLES
Table I Summary Table for
Monitoring Activities in the Reporting Month
Table II Summary Table for Events
Recorded in the Reporting Month
Table 2.1 Key Contacts of the Contract
Table 2.2 Status of Environmental Licences,
Notification and Permits
Table 3.1 Location for Air Quality Monitoring
Locations
Table 3.2 Air Quality Monitoring Equipment
Table 3.3 Impact Dust Monitoring Parameters, Frequency
and Duration
Table 3.4
Summary Table of 1-hour TSP Monitoring Results during the Reporting Month
Table 3.5 Summary Table of 24-hour TSP Monitoring
Results during the Reporting Month
Table 3.6 Observation at Dust Monitoring Stations
Table 4.1 Location for Noise Monitoring Locations
Table 4.2 Noise Monitoring Equipment
Table 4.3 Noise Monitoring Parameters, Frequency
and Duration
Table 4.4 Summary Table of Noise Monitoring Results
during the Reporting Month
Table 4.5 Observation at Noise Monitoring Stations
Table 5.1 Location for Marine Water Quality
Monitoring Locations
Table 5.2 Water Quality Monitoring Equipment
Table 5.3 Water Quality Monitoring Parameters and
Frequency
Table 5.4 Methods for Laboratory Analysis for Water
Samples
Table 5.5 Summary of Water Quality Exceedances
Table 6.1 Co-ordinates of transect lines in WL
survey area
Table 6.2 Dolphin encounter rates (sightings per
100 km of survey effort) in February’s surveys
Table 7.1 Observations and Recommendations of Site
Audit
LIST OF
FIGURE
Figure 2 Project
Organisation for Environmental Works
Figure 3 Locations
of Air Quality, Noise and Wind Monitoring Stations
Figure 4 Locations
of Water Quality Monitoring Stations
LIST OF
APPENDICES
Appendix
A Construction Programme
Appendix
B Action and Limit
Levels
Appendix
C Copies of Calibration
Certificates
Appendix
D Environmental
Monitoring Schedules
Appendix
E 1-hour TSP
Monitoring Results
Appendix
F 24-hour TSP Monitoring
Results
Appendix
G Noise Monitoring Results
Appendix H Water
Quality Monitoring Results and Graphical Presentations (DO, Turb
& SS)
Appendix
I Dolphin
Monitoring Report (Line Transect)
Appendix
L Summary of
Exceedance
Appendix
N Updated Environmental
Mitigation Implementation Schedule