TABLE
OF CONTENTS
Introduction
Environmental
Monitoring and Audit Progress
Breaches
of Action and Limit Levels
Future
Key Issues
Purpose
of the report
Structure
of the report
Background
Contract
Organisation
Construction
Programme
Summary
of Construction Works Undertaken During Reporting Period
Status
of Environmental Licences, Notification and Permits
3 ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
Monitoring
Parameters and Monitoring Locations
Monitoring
Methodology and Calibration Details
Environmental
Quality Performance Limits (Action and Limit Levels)
Event and
Action Plan
Implementation
Status of Environmental Mitigation Measures
Site
Audit Summary
Status
of Waste Management
4 ENVIRONMENTAL
MONITORING RESULTS
Air
Quality Monitoring Results
Noise
Monitoring Results
Water
Quality Monitoring Results
Dolphin
Monitoring (Line-transect Vessel Survey)
ADDITIONAL
LAND-BASED DOLPHIN BEHAVIOUR AND MOVEMENT MONITORING
Advice
on the Solid and Liquid Waste Management Status
5 ENVIRONMENTAL
NON-CONFORMANCE (EXCEEDANCES)
Summary
of Exceedances
Summary
of Environmental Complaint
Summary
of Notification of Summons and Successful Prosecution
6 CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
LIST
OF TABLES
Table I Summary
Table for Monitoring Activities in the Reporting Period
Table II Summary
Table for Events Recorded in the Reporting Period
Table III Summary
Table for Complaints Recorded in the Reporting Period
Table 2.1 Key
Contacts of the Contract
Table 3.1 Summary of
Impact EM&A Requirements
Table 3.2a Action and Limit
Levels for 1-Hour TSP
Table 3.2b Action and Limit Levels
for 24-Hour TSP
Table 3.2c Action and Limit
Levels for Construction Noise
Table 3.2d Action and Limit Levels
for Water Quality
Table 3.2e Action
and Limit Levels for Dolphin Line Transect Monitoring
Table 4.1 Summary
Table of 1-hour TSP Monitoring Results during the Reporting Period
Table 4.2 Summary
Table of 24-hour TSP Monitoring Results during the Reporting Period
Table 4.3 Observation
at Dust Monitoring Stations
Table 4.4 Summary
Table of Noise Monitoring Results during the Reporting Period
Table 4.5 Observation
at Noise Monitoring Stations
Table 5.1 Summary of
Environmental Complaints in the Reporting Period
LIST
OF FIGURE
Figure 2 Project
Organisation for Environmental Works
Figure 3 Locations
of Air Quality, Noise and Wind Monitoring Stations
Figure 4 Locations
of Water Quality Monitoring Stations
LIST
OF APPENDICES
Appendix A Construction
Programme
Appendix B Graphical
Presentation of 1-hour TSP Monitoring Results
Appendix C Graphical
Presentation of 24-hour TSP Monitoring Results
Appendix D Graphical
Presentation of Noise Monitoring Results
Appendix
E Graphical
Presentation of Water Quality Monitoring Results (DO, Turb & SS)
Appendix F Dolphin
Monitoring Report (Line Transect)
Appendix H Updated
Environmental Mitigation Implementation Schedule
Appendix J Waste
Generation in the Reporting Month