table of Contents
1.1 Background
1.2 Scope
of Report
1.3 Organization
Structure
1.4 Summary
of Construction Works
2.1 Air
quality
2.2 Water
Quality Monitoring
2.3 Dolphin
Monitoring
2.4 EM&A
Site Inspection
2.5 Waste
Management Status
2.6 Environmental
Licenses and Permits
2.7 Implementation
Status of Environmental Mitigation Measures
2.8 Summary
of Exceedances of the Environmental Quality Performance Limit
2.9 Summary
of Complaints, Notification of Summons and Successful Prosecutions
3.1 Construction
Activities for the Coming Month
3.2 Key
Issues for the Coming Month
3.3 Monitoring
Schedule for the Coming Month
4 Conclusions
and recommendations
4.1 Conclusions
Appendix A
|
Project Organization for Environmental
Works
|
Appendix B
|
Construction Programme
|
Appendix C
|
Environmental Mitigation And Enhancement Measure
Implementation Schedules (EMIS)
|
Appendix D
|
Summary of Action And Limit Levels
|
Appendix E
|
Copies of Calibration Certificate for Air
Quality Monitoring
|
Appendix F
|
EM&A Monitoring Schedules
|
Appendix G
|
Impact Air Quality Monitoring Results
|
Appendix H
|
Meteorological Data
|
Appendix I
|
Impact Dolphin Monitoring Survey
|
Appendix J
|
Event And Action Plan
|
Appendix K
|
Cumulative Statistics On Exceedance, Complaints,
Notifications of Summons and Successful Prosecutions
|
Appendix L
|
Waste Flow Table
|
Under Contract No. HY/2012/08,
Dragages – Bouygues Joint Venture (DBJV) is commissioned by the Highways
Department (HyD) to undertake the design and construction of the Northern
Connection Sub-sea Tunnel Section of the Tuen Mun – Chek Lap Kok Link Project (TM-CLK
Link Project) while AECOM Asia Company Limited was appointed by HyD as the
Supervising Officer. For implementation
of the environmental monitoring and audit (EM&A) programme under the
Contract, ERM-Hong Kong, Limited (ERM) has been appointed as the Environmental
Team (ET) in accordance with Environmental
Permit No. EP-354/2009/A. Ramboll Environ Hong
Kong Ltd. was employed by HyD as the Independent Environmental Checker (IEC)
and Environmental Project Office (ENPO).
Subsequent applications for variation of environmental
permits (VEP), EP-354/2009/B, EP-354/2009/C and EP-354/2009/D, were granted on 28 January 2014, 10 December 2014
and 13 March 2015, respectively.
The construction phase of the Project commenced on 1
November 2013 and will tentatively be completed by the end of 2018. The impact monitoring of the EM&A
programme, including air quality, water quality, marine ecological monitoring and
environmental site inspections, were commenced on 1 November 2013.
This is the Twenty-first Monthly EM&A report
presenting the EM&A works carried out during the period from 1 to 31 July 2015
for the Contract No. HY/2012/08 Northern Connection
Sub-sea Tunnel Section (the “Project”) in
accordance with the Updated EM&A Manual of the TM-CLK
Link Project. As informed by the
Contractor, major activities in the reporting period included:
Land-based Works
·
Surcharge Removal at Works Area – Portion N-C;
·
Box Culvert Extension at Works Area – Portion N-A;
·
Excavation for Ventilation Shaft at Works Area –
Portion N-C;
·
Startup of TBM at Works Area – Portion N-A; and
·
Set up of Slurry Treatment Plant at Works Area –
Portion N-C.
A
summary of monitoring and audit activities conducted in the reporting period is
listed below:
24-hour
TSP Monitoring 11 sessions
1-hour
TSP Monitoring 11
sessions
Impact
Dolphin Monitoring 2
sessions
Joint
Environmental Site Inspection 5 sessions
Implementation of Marine Mammal Exclusion Zone
There was no dredging, reclamation or marine
sheet piling works in open waters during this reporting period. Thus,
Passive Acoustic Monitoring (PAM) and the day-time monitoring of Dolphin
Exclusion Zone (DEZ) by dolphin observers were not in effect during the
reporting period.
Summary
of Breaches of Action/Limit Levels
Breaches of Action and Limit Levels for Air Quality
No
Action Level or Limit Level of air quality exceedances were recorded in the air
quality monitoring of this reporting month.
Environmental
Complaints, Non-compliance & Summons
No non-compliance with
EIA recommendations,
EP conditions and other requirements associated with the construction of this Contract
was recorded in this reporting period.
No environmental complaint
was received in this reporting period.
No environmental summons was received in this reporting
period.
Reporting Change
There
was no reporting change required in the reporting period.
Upcoming
Works for the Next Reporting Month
Works
to be undertaken in the next monitoring period of August 2015 include the
following:
Land-based Works
·
Box Culvert Extension at Works Area – Portion N-A;
·
Installation of Tower Crane at Works Area – Portion
N-C;
·
Base Slap Construction for Ventilation Shaft at Works
Area – Portion N-C;
·
Startup of TBM at Works Area – Portion N-A; and
·
Assembly of Slurry Treatment Plant at Works Area –
Portion N-C.
Future
Key Issues
Potential
environmental impacts arising from the above upcoming construction activities
in the next reporting month of August 2015 are expected to be mainly associated
with dust, marine ecology and waste management.
According
to the findings of the Northwest New Territories (NWNT) Traffic and
Infrastructure Review conducted by the Transport Department, Tuen Mun Road,
Ting Kau Bridge, Lantau Link and North Lantau Highway would be operating beyond
capacity after 2016. This forecast has
been based on the estimated increase in cross boundary traffic, developments in
the Northwest New Territories (NWNT), and possible developments in North
Lantau, including the Airport developments, the Lantau Logistics Park (LLP) and
the Hong Kong – Zhuhai – Macao Bridge (HZMB). In order to cope with the anticipated traffic
demand, two new road sections between NWNT and North Lantau – Tuen Mun – Chek
Lap Kok Link (TM-CLKL) and Tuen Mun Western Bypass (TMWB) are proposed.
An
Environmental Impact Assessment (EIA) of TM-CLKL (the Project) was prepared in
accordance with the EIA Study Brief (No. ESB-175/2007) and
the Technical Memorandum of the
Environmental Impact Assessment Process (EIAO-TM). The EIA
Report was submitted under the Environmental Impact Assessment Ordinance (EIAO)
in August 2009. Subsequent to the
approval of the EIA Report (EIAO Register Number AEIAR-146/2009), an
Environmental Permit (EP-354/2009) for TM-CLKL was granted by the Director of Environmental
Protection (DEP) on 4 November 2009, and EP variation (VEP) (EP-354/2009A) was
issued on 8 December 2010. Subsequent
applications for variation of environmental permits (VEPs), EP-354/2009/B, EP-354/2009/C and EP-354/2009/D, were granted on 28
January 2014, 10 December 2014 and 13 March 2015, respectively.
Under Contract
No.
HY/2012/08, Dragages – Bouygues Joint
Venture (DBJV) is commissioned by the Highways Department (HyD) to undertake
the design and construction of the Northern Connection Sub-sea Tunnel Section
of TM-CLKL while AECOM Asia Company Limited was appointed by HyD as the
Supervising Officer. For implementation
of the environmental monitoring and audit (EM&A) programme under the
Contract, ERM-Hong Kong, Limited (ERM) has been appointed as the Environmental
Team (ET). Ramboll Environ
Hong Kong Ltd. was employed by HyD as the Independent Environmental Checker
(IEC) and Environmental Project Office (ENPO).
Layout
of the Contract components is presented in Figure 1.1.
The
organization structure of the Contract is shown in Appendix A. The key personnel contact names and contact
details are summarized in Table 1.1
below.
Table 1.1 Contact Information of Key Personnel
Party |
Position |
Name |
Telephone |
Fax |
Highways
Department |
Engr
16/HZMB |
Kenneth Lee |
2762 4996 |
3188 6614 |
SOR (AECOM Asia
Company Limited) |
Chief
Resident Engineer |
Edwin Ching Andrew
Westmoreland |
2293 6388 2293 6360 |
2293 6300 2293 6300 |
ENPO / IEC (Ramboll Environ Hong Kong Ltd.) |
ENPO Leader |
Y.H. Hui |
3547 2133 |
3465 2899 |
IEC |
Dr. F.C. Tsang |
3547 2134 |
3465 2899 |
|
Contractor (Dragages
– Bouygues Joint Venture) |
Environmental
Manager |
C.F. Kwong |
2293 7322 |
2670 2798 |
Environmental
Officer 24-hour
complaint hotline |
Bryan Lee Rachel Lam |
2293 7323 2293 7330 |
2670 2798 |
|
ET (ERM-HK) |
ET Leader |
Jovy Tam |
2271 3113 |
2723 5660 |
Table 1.2 Summary of Construction Activities Undertaken during the
Reporting Period
Construction Activities Undertaken |
Land-based Works |
·
Surcharge Removal at Works Area – Portion N-C; ·
Box Culvert Extension at Works Area – Portion N-A; ·
Excavation for Ventilation Shaft at Works Area –
Portion N-C; ·
Startup of TBM at Works Area – Portion N-A; and ·
Set up of Slurry Treatment Plant at Works Area –
Portion N-C. |
Figure
1.2 Locations of Construction Activities – July
2015
|
The
EM&A programme required environmental monitoring for air quality, water
quality and marine ecology as well as environmental site inspections for air
quality, noise, water quality, waste management, marine ecology and landscape
and visual impacts. The EM&A
requirements and related findings for each component are summarized in the
following sections
In
accordance with the Updated EM&A Manual and the Enhanced TSP Monitoring
Plan, impact 1-hour TSP monitoring was conducted three (3) times every six (6)
days and impact 24-hour TSP monitoring was carried out once every six (6) days when
the highest dust impact was expected. 1-hr
and 24-hr TSP monitoring frequency was increased to three times per day every
three days and daily every three days, respectively, as excavation works for
launching shaft commenced on 24 October 2014.
High
volume samplers (HVSs) were used to carry out the 1-hour and 24-hour TSP monitoring
on 2 , 5 , 7 , 10 , 13 , 16 , 19 , 22 , 25 , 28 and 31 July 2015 at the five
(5) air quality monitoring stations in accordance with the requirements stipulated
in the Updated EM&A Manual (Figure 2.1; Table 2.1).
Wind meter was installed at the rooftop
of ASR5 for logging wind speed and wind direction. Details of the equipment deployed are
provided in Table 2.2. Copies of the calibration certificates for the
equipment are presented in Appendix E.
Table 2.1 Locations of Impact Air Quality Monitoring Stations and
Monitoring Dates in this Reporting Period
Monitoring
Station |
Monitoring
Dates |
Location |
Description |
Parameters & Frequency |
ASR1 |
2
, 5 , 7 , 10 , 13 , 16 , 19 , 22 , 25 , 28 and 31 July 2015 |
Tuen
Mun Fireboat Station |
Office |
TSP monitoring
1-hour Total Suspended Particulates (1-hour
TSP, µg/m3), 3 times in every 6 days
24-hour Total Suspended Particulates
(24-hour TSP, µg/m3), daily for 24-hour in every 6 days Enhanced TSP monitoring (commenced on 24
October 2014)
1-hour Total Suspended Particulates (1-hour
TSP, µg/m3), 3 times in every 3 days
24-hour Total Suspended Particulates
(24-hour TSP, µg/m3), daily for 24-hour in every 3 days |
ASR5 |
|
Pillar
Point Fire Station |
Office |
|
AQMS1 |
|
Previous
River Trade Golf |
Bare
ground |
|
ASR6 |
|
Butterfly
Beach Laundry |
Office |
|
ASR10 |
|
Butterfly
Beach Park |
Recreational
uses |
Table 2.2 Air Quality
Monitoring Equipment
Equipment |
Brand and Model |
High
Volume Sampler |
Tisch Environmental Mass Flow Controlled Total Suspended
Particulate (TSP) High Volume Sampler (Model No. TE-5170) |
Wind
Meter |
Davis
(Model: Weather Wizard III (S/N: WE90911A30) |
Wind
Anemometer for calibration |
Lutron
(Model No. AM-4201) |
The
Action and Limit Levels of the air quality monitoring is provided in Appendix D. The
Event and Action plan is presented in Appendix J.
The
schedule for air quality monitoring in July 2015 is provided in Appendix F.
The
monitoring results for 1-hour TSP and 24-hour TSP are summarized in Tables 2.3 and 2.4, respectively. Detailed
impact air quality monitoring results and graphical presentations are presented
in Appendix G.
Table 2.3 Summary of 1-hour TSP Monitoring Results in this Reporting
Period
Station |
Average (µg/m3) |
Range (µg/m3) |
Action Level (µg/m3) |
Limit Level (µg/m3) |
ASR1 |
105 |
52
– 196 |
331 |
500 |
ASR5 |
138 |
69
– 205 |
340 |
500 |
AQMS1 |
97 |
60
– 153 |
335 |
500 |
ASR6 |
114 |
55
– 175 |
338 |
500 |
ASR10 |
70 |
49
– 110 |
337 |
500 |
Table 2.4 Summary of 24-hour TSP Monitoring Results in this Reporting
Period
Station |
Average (µg/m3) |
Range (µg/m3) |
Action Level (µg/m3) |
Limit Level (µg/m3) |
ASR1 |
64 |
50
– 83 |
213 |
260 |
ASR5 |
74 |
51
– 96 |
238 |
260 |
AQMS1 |
61 |
52
– 71 |
213 |
260 |
ASR6 |
63 |
50
– 74 |
238 |
260 |
ASR10 |
54 |
45
– 63 |
214 |
260 |
The
weather condition during the monitoring period varied from sunny to
cloudy. The major dust sources in the
reporting period include construction activities under the Contract as well as
nearby traffic emissions.
A
total of eleven monitoring events were undertaken in which no Action or Limit Level
exceedances of 1-hr TSP were recorded in this reporting month. No Action or Limit Level exceedances for
24-hr TSP were record.
Meteorological
information collected at the ASR5, including wind speed and wind direction, is provided
in Appendix H.
As informed by the Contractor, Phase I Reclamation
works for the Northern Landfall was substantially completed in December 2014, a
proposal letter was sent to EPD on 21 May 2015 to seek approval for the
temporary suspension of Water Quality Monitoring. Subsequently, a letter from EPD on 5 June
2015 stated that they have no strong objection to the temporary suspension of
the water quality monitoring. Water
Quality Monitoring was suspended from 6 June 2015 effectively and will resume
when Phase II Reclamation commences in the fourth quarter of 2016 tentatively.
Impact
dolphin monitoring is required to be conducted by a qualified dolphin
specialist team to evaluate whether there have been any effects on the
dolphins. In order to fulfil the
EM&A requirements and make good use of available resources, the on-going
impact line transect dolphin monitoring data collected by HyD’s
Contract No. HY/2011/03 Hong Kong-Zhuhai-Macao Bridge. Hong
Kong Link Road - Section between Scenic Hill and Hong Kong Boundary Crossing
Facilities on the monthly basis is adopted to avoid duplicates of survey
effort.
Table 2.5 summarises
the equipment used for the impact dolphin monitoring.
Table 2.5 Dolphin Monitoring Equipment
Equipment |
Model |
Global Positioning
System (GPS) |
Garmin 18X-PC Geo One Phottix |
Camera |
Nikon D90 300m 2.8D fixed focus Nikon D90 20-300m zoom lens |
Laser Binocular |
Infinitor LRF 1000 |
Marine Binocular |
Bushell 7 x 50 marine binocular with compass and
reticules |
Vessel for Monitoring |
65 foot single
engine motor vessel with viewing platform 4.5m above water level |
Dolphin
monitoring should cover all transect lines in Northeast Lantau (NEL) and the
Northwest Lantau (NWL) survey areas twice per month throughout the entire
construction period. The monitoring data
should be compatible with, and should be made available for, long-term studies
of small cetacean ecology in Hong Kong. In
order to provide a suitable long-term dataset for comparison, identical
methodology and line transects employed in baseline dolphin monitoring was
followed in the impact dolphin monitoring.
The
impact dolphin monitoring was carried out in the NEL and NWL along the line
transect as depicted in Figure 2.2. The co-ordinates of all transect lines are
shown in Table 2.6 below.
Table 2.6 Impact Dolphin Monitoring Line Transect Co-ordinates
Line No. |
Easting |
Northing |
Line No. |
Easting |
Northing |
||
1 |
Start
Point |
804671 |
814577 |
13 |
Start
Point |
816506 |
819480 |
1 |
End Point |
804671 |
831404 |
13 |
End Point |
816506 |
824859 |
2 |
Start
Point |
805475 |
815457 |
14 |
Start
Point |
817537 |
820220 |
2 |
End Point |
805477 |
826654 |
14 |
End Point |
817537 |
824613 |
3 |
Start
Point |
806464 |
819435 |
15 |
Start
Point |
818568 |
820735 |
3 |
End Point |
806464 |
822911 |
15 |
End Point |
818568 |
824433 |
4 |
Start
Point |
807518 |
819771 |
16 |
Start
Point |
819532 |
821420 |
4 |
End Point |
807518 |
829230 |
16 |
End Point |
819532 |
824209 |
5 |
Start
Point |
808504 |
820220 |
17 |
Start
Point |
820451 |
822125 |
5 |
End Point |
808504 |
828602 |
17 |
End Point |
820451 |
823671 |
6 |
Start
Point |
809490 |
820466 |
18 |
Start
Point |
821504 |
822371 |
6 |
End Point |
809490 |
825352 |
18 |
End Point |
821504 |
823761 |
7 |
Start
Point |
810499 |
820690 |
19 |
Start
Point |
822513 |
823268 |
7 |
End Point |
810499 |
824613 |
19 |
End Point |
822513 |
824321 |
8 |
Start
Point |
811508 |
820847 |
20 |
Start
Point |
823477 |
823402 |
8 |
End Point |
811508 |
824254 |
20 |
End Point |
823477 |
824613 |
9 |
Start
Point |
812516 |
820892 |
21 |
Start
Point |
805476 |
827081 |
9 |
End Point |
812516 |
824254 |
21 |
End Point |
805476 |
830562 |
10 |
Start
Point |
813525 |
820872 |
22 |
Start
Point |
806464 |
824033 |
10 |
End Point |
813525 |
824657 |
22 |
End Point |
806464 |
829598 |
11 |
Start
Point |
814556 |
818449 |
23 |
Start
Point |
814559 |
821739 |
11 |
End Point |
814556 |
820992 |
23 |
End Point |
814559 |
824768 |
12 |
Start
Point |
815542 |
818807 |
|
|
|
|
12 |
End Point |
815542 |
824882 |
|
|
|
|
The
Action and Limit levels of impact dolphin monitoring are shown in Appendix D. The
Event and Action plan is presented in Appendix J.
Dolphin
monitoring was carried out on 2, 7, 22 and 27 of July 2015. The dolphin monitoring schedule for the
reporting month is shown in Appendix F.
A
total of 301.62 km of survey effort was collected, with 87.2% of the total
survey effort being conducted under favourable weather conditions (ie Beaufort
Sea State 3 or below with good visibility) in July 2015. Amongst the two areas, 116.10 km and 185.52 km
of survey effort were collected from NEL and NWL survey areas, respectively. The total survey effort conducted on primary
and secondary lines were 219.76 km and 81.86 km, respectively. The survey efforts are summarized in Appendix I.
A
total of 3 groups of six Chinese White Dolphin sightings were recorded
during the two sets of surveys in July 2015.
All three sightings were made in NWL during the survey in July
2015. All three sightings were made on
primary lines during on-effort search, and the sighting was not associated with
operating fishing vessel.
None of the sightings was made in the vicinity of the TM-CLKL
Northern Connection Sub-sea Tunnel Section. The distribution of dolphin sightings during
the reporting month is shown in Figure 2.3.
Encounter
rates of Chinese White Dolphins are deduced from the survey effort and
on-effort sighting data made under favourable conditions (Beaufort 3 or below
with good visibility) in July 2015 with the results present in Tables 2.7 and 2.8.
Table 2.7 Individual Survey Event Encounter Rates
|
Encounter
rate (STG) (no. of on-effort dolphin sightings per 100 km of
survey effort) |
Encounter
rate (ANI) (no. of dolphins from all on-effort sightings per
100 km of survey effort) |
|
Primary
Lines Only |
Primary
Lines Only |
||
NEL |
Set 1: July 2nd/7th |
0.0 |
0.0 |
Set 2: July 22nd/27th |
0.0 |
0.0 |
|
NWL |
Set 1: July 2nd/7th |
1.7 |
3.4 |
Set 2: July 22nd/27th |
3.5 |
6.9 |
Note: Dolphin Encounter Rates are deduced from the Two
Sets of Surveys (Two Surveys in Each Set) in July 2015 in Northeast (NEL) and
Northwest Lantau (NWL)
Table 2.8 Monthly Average Encounter Rates
|
Encounter
rate (STG) (no. of on-effort dolphin sightings per 100
km of survey effort) |
Encounter
rate (ANI) (no. of dolphins
from all on-effort sightings per 100 km of survey effort) |
||
Primary Lines Only |
Both
Primary and Secondary Lines |
Primary Lines Only |
Both
Primary and Secondary Lines |
|
Northeast
Lantau |
0.0 |
0.0 |
0.0 |
0.0 |
Northwest
Lantau |
2.6 |
2.0 |
5.1 |
4.1 |
Note: Overall
dolphin encounter rates (sightings per 100 km of survey effort) from all four
surveys are conducted in July 2015 on primary lines only as well as both
primary lines and secondary lines in Northeast and Northwest Lantau.
Due
to monthly variation in dolphin occurrence within the survey area, it would be
more appropriate to draw conclusion on whether any unacceptable impacts on
dolphins have been detected in relation to the construction activities of this
Project in the quarterly EM&A reports, where comparison on distribution,
group size and encounter rates of dolphins between the quarterly impact
monitoring period and baseline monitoring period will be made.
There was no dredging, reclamation or marine
sheet piling works in open waters during this reporting period. Thus,
Passive Acoustic Monitoring (PAM) and the day-time monitoring of Dolphin
Exclusion Zone (DEZ) by dolphin observers were not in effect during the
reporting period.
Site
inspections were carried out on a weekly basis to monitor the implementation of
proper environmental pollution control and mitigation measures under the
Contract. In the reporting month, five (5)
site inspections were carried out on 2, 8, 15, 22 and 29 July 2015.
Key
observations and recommendations during the site inspections in this reporting
period are summarized in Table 2.9.
Table 2.9 Specific Observations and Recommendations during the Weekly
Site Inspection in this Reporting Month
Inspection
Date |
Observations |
Recommendations/
Remarks |
2 July 2015 |
Works Area -
Portion N-B
Site drainage should be maintained more frequently.
Chemical containers should be placed in chemical
storage area. |
Works Area -
Portion N-A
The Contractor was reminded to regularly check and
maintain the capacity of site drainage.
The Contractor was reminded to place the chemical
containers in the chemical storage area while not in use. |
8 July 2015 |
Works Area -
Portion N-A
Chemical labels should be provided to the chemical
containers.
Accumulated general refuse should be cleared.
Chemical container should be placed in chemical
storage area and chemical labels should be provided. |
Works Area -
Portion N-A
The Contractor was reminded to provide chemical
labels to the chemical containers.
The Contractor was reminded to clear accumulated
general refuse.
The Contractor was reminded to place the chemical
container in chemical storage area and provide chemical labels to the
chemical container. |
15 July 2015 |
Works Area -
Portion N-A
Accumulated general refuse should be cleared more
frequently. Works Area –
Portion N-B
Excess sandy material should be cleared more
frequently during rainy season. |
Works Area -
Portion N-A
The Contractor was reminded to clear the accumulated
general refuse. Works Area –
Portion N-B
The Contractor was reminded to clear the excess
sandy material. |
22 July 2015 |
Works Area -
Portion N-A
Accumulated general refuse should be cleared more
frequently.
Drip tray should be clear of sandy materials.
Excess sandy materials should be cleared to maintain
capacity of the silt removal facilities. |
Works Area -
Portion N-A
The Contractor was reminded to clear the accumulated
general refuse.
The Contractor was reminded to clear the sandy
materials in the drip tray.
The Contractor was reminded to place clear the
excess sandy materials in the silt removal facilities. |
29 July 2015 |
Works Area -
Portion N-A
Excess sandy materials should be cleared to avoid
runoff. Works Area –
Portion N-B
Muddy water should be cleared to avoid runoff.
Watering should be applied to the materials during
loading of barges. |
Works Area -
Portion N-A
The Contractor is reminded to clear the excess sandy
materials to avoid runoff. Works Area –
Portion N-B
The Contractor is reminded to clear the muddy water
to avoid runoff.
The Contractor is reminded to apply watering to the
materials during loading of barges. |
The
Contractor has rectified all of the observations as identified during
environmental site inspections in the reporting month.
The
Contractor had submitted application form for registration as chemical waste
producer under the Contract. Sufficient
numbers of receptacles were available for general refuse collection and
sorting.
Wastes
generated during this reporting period include mainly construction wastes
(inert and non-inert). Reference has
been made to the waste flow table prepared by the Contractor (Appendix L). The
quantities of different types of wastes are summarized in Table 2.10.
Table 2.10 Quantities of Different Waste Generated in the Reporting Month
Month/Year |
Inert Construction Waste (a)
(tonnes) |
Imported Fill (tonnes) |
Inert Construction Waste
Re-used (tonnes) |
Non-inert Construction Waste (b)
(tonnes) |
Recyclable Materials (c) (kg) |
Chemical Wastes (kg) |
Marine Sediment (m3) |
|
Category L |
Category M (Mp
& Mf) |
|||||||
July 2015 |
158,301 |
0 |
0 |
172 |
0 |
0 |
0 |
0 |
Notes: |
||||||||
(a) Inert
construction wastes include hard rock and large broken concrete, and
materials disposed as public fill. (b) Non-inert
construction wastes include general refuse disposed at landfill. (c) Recyclable
materials include metals, paper, cardboard, plastics, timber and others. |
The
Contractor was advised to properly maintain on site C&D materials and waste
collection, sorting and recording system, dispose of C&D materials and
wastes at designated ground and maximize reuse/ recycle of C&D materials
and wastes. The Contractor was also
reminded to properly maintain the site tidiness and dispose of the wastes
accumulated on site regularly and properly.
For
chemical waste containers, the Contractor was reminded to treat properly and
store temporarily in designated chemical waste storage area on site in
accordance with the Code of Practice on the Packaging, Labelling and Storage of
Chemical Wastes.
The
status of environmental licensing and permit is summarized in Table 2.11 below.
Table 2.11 Summary of Environmental Licensing and Permit Status
License/
Permit |
License
or Permit No. |
Date
of Issue |
Date
of Expiry |
License/
Permit Holder |
Remarks |
Environmental
Permit |
EP-354/2009/D |
13 March
2015 |
Throughout
the Contract |
HyD |
Application for VEP on 3 March 2015 to supersede EP-354/2009/C |
Construction
Dust Notification |
363510 |
19 August
2013 |
Throughout
the Contract |
DBJV |
- |
Chemical
Waste Registration |
5213-422-D2516-01 |
10
September 2013 |
Throughout
the Contract |
DBJV |
- |
Construction
Waste Disposal Account |
7018108 |
28 August
2013 |
Throughout
the Contract |
DBJV |
Waste disposal in Contract No. HY/2012/08 |
Waste Water
Discharge License |
WT00017707-2013 |
18 November
2013 |
30 November
2018 |
DBJV |
For site WA18 |
Waste Water
Discharge License |
WT00019248-2014 |
5 June 2014 |
30 June
2019 |
DBJV |
For site Portion N6 and Reclamation Area E |
Construction
Noise Permit |
GW-RW0350-15 |
14 July
2015 |
13 December
2015 |
DBJV |
For site
WA23 |
Construction Noise Permit |
GW-RW0140-15 |
29 March 2015 |
28 September 2015 |
DBJV |
For Portion N6 |
Construction Noise Permit |
GW-RW0216-15 |
20 May 2015 |
19 July 2015 |
DBJV |
For Dredging and Reclamation Works |
Construction Noise Permit |
GW-RW0311-15 |
20 July 2015 |
19 October 2015 |
DBJV |
For Dredging and Reclamation Works |
Construction Noise Permit |
GW-RW0150-15 |
1 April 2015 |
30 September 2015 |
DBJV |
For GI Works at Southern Landfall |
Notes: |
|||||
HyD =
Highways Department DBJV = Dragages
– Bouygues Joint Venture VEP =
Variation of Environmental Permit |
In response to the site audit findings, the
Contractors carried out all corrective actions.
A summary of the Implementation Schedule of
Environmental Mitigation Measures (EMIS) is presented in Appendix C. The necessary mitigation measures relevant to
this Contract were implemented properly.
No
Action Level or Limit Level exceedances were recorded in the air quality
monitoring of this reporting month.
Cumulative
statistics are provided in Appendix K.
The
Environmental Complaint Handling Procedure is provided in Figure 2.4.
No
environmental complaint was received in the reporting period.
No
notification of summons and prosecution were received in the reporting period.
Statistics
on complaints, notifications of summons and successful prosecutions are
summarized in Appendix K.
As
informed by the Contractor, the major works for the Project in August 2015 are
summarized in Table 3.1.
Table 3.1 Construction Works to Be Undertaken in the Coming Month
Works to be undertaken |
Land-based Works |
·
Box Culvert Extension at Works Area – Portion N-A; ·
Installation of Tower Crane at Works Area – Portion
N-C; ·
Base Slap Construction for Ventilation Shaft at
Works Area – Portion N-C; ·
Startup of TBM at Works Area – Portion N-A; and ·
Assembly of Slurry Treatment Plant at Works Area –
Portion N-C. |
Potential
environmental impacts arising from the above upcoming construction activities in
the next reporting month of August 2015 are mainly associated with dust, marine
ecology and waste management issues.
The
tentative schedule for environmental monitoring in August 2015 is provided in Appendix F.
This
Twenty-first Monthly EM&A Report presents the findings of the
EM&A activities undertaken during the period from 1 to 31 July 2015, in
accordance with the Updated EM&A Manual and the requirements of EP-354/2009/D.
Air
quality (including 1-hour TSP and 24-hour TSP) and dolphin monitoring were
carried out in this reporting month. No Action Level or Limit Level
exceedances were recorded in the air quality monitoring of this reporting
month.
A
total of three (3) groups of six (6) Chinese White Dolphin
sightings were recorded during the two sets of surveys
in July 2015. All three sightings were
made in NWL during the two sets of surveys in July 2015. All three sightings were made on primary
lines during on-effort search, and none of the dolphin groups was associated
with operating fishing vessel. No unacceptable impact from the construction
activities of the TM-CLKL Northern Connection Sub-sea Tunnel Section on Chinese
White Dolphins was noticeable from general observations during the dolphin
monitoring in this reporting month.
Environmental
site inspection was carried out five (5) times in July 2015. Recommendations on remedial actions recommended
for the deficiencies identified during the site audits were properly
implemented by the Contractor.
No
non-compliance event was recorded during the reporting period.
No
environmental complaint was received during the reporting period.
No
summons/ prosecution was received during the reporting
period.
The
ET will keep track on the construction works to confirm compliance of
environmental requirements and the proper implementation of all necessary
mitigation measures.