TABLE OF
CONTENTS
Introduction
Environmental Monitoring works
Background
Contract Organisation
Summary of EM&A Requirements
Purpose of the report
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC Procedure
1-hour and 24-hour TSP Air Quality
Monitoring
Instrumentation
HVS Installation
Filters Preparation
Operating/Analytical Procedures
Maintenance/Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC
Procedures
Maintenance and Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency
Monitoring Methodology
Instrumentation
Operating/Analytical Procedures
Laboratory Analytical Methods
QA/QC Requirements
Maintenance and Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
DOLPHIN MONITORING (LINE-TRANSECT VESSEL
SURVEY)
Monitoring Requirements
Monitoring Location
Monitoring Frequency
Monitoring Results and Observations
CONSTRUCTION-PHASE UNDERWATER NOISE
MONITORING
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Methodology
Monitoring Results
DOLPHIN BEHAVIOUR MONITORING (ACOUSTIC)
Monitoring Requirements
Monitoring Location
Monitoring Results
LAND-BASED DOLPHIN BEHAVIOUR AND MOVEMENT
MONITORING
Monitoring Requirements
Monitoring Location
Monitoring Frequency
Monitoring Results
ADDITIONAL LAND-BASED DOLPHIN BEHAVIOUR
AND MOVEMENT MONITORING
LAND-BASED DOLPHIN BEHAVIOUR AND MOVEMENT
MONITORING AFTER BRIDGE CONSTRUCTION
Construction Program and Monitoring Period
6 ENVIRONMENTAL
SITE INSPECTION
Site Audits
Implementation Status of Environmental Mitigation
Measures
Solid and Liquid Waste Management Status
Summary of Exceedances
Review of the Reasons for and the
Implications of Non-compliance
Summary of Environmental Complaint
Summary of Notification of Summons and
Successful Prosecution
8 REVIEW
OF ENVIRONMENTAL MONITORING RESULTS
Weather Conditions
Influencing Factors on the Monitoring
Results
Comparison of EM&A results with EIA
predictions / Baseline Data / Post Monitoring Data
9 COMMENTS,
CONCLUSIONS AND RECOMMENDATIONS
Validity of EIA Predictions
Comments on Overall EM&A Programme
Overall EM&A Data
Recommendations and Conclusions
LIST OF
TABLES
Table I Summary Table for
Monitoring Activities in the Reporting Month
Table 1.1 Key Contacts of the Contract
Table 2.1 Location for Air Quality Monitoring
Locations
Table 2.2 Air Quality Monitoring Equipment
Table 2.3 Impact Dust Monitoring Parameters,
Frequency and Duration
Table 3.1 Location for Noise Monitoring Stations
Table 3.2 Noise Monitoring Equipment
Table 3.3 Noise Monitoring Parameters, Frequency
and Duration
Table 4.1 Location for Marine Water Quality
Monitoring Locations
Table 4.2 Water Quality Monitoring Equipment
Table 4.3 Water Quality Monitoring Parameters and
Frequency
Table 4.4 Methods for Laboratory Analysis for Water
Samples
Table 5.1 Co-ordinates of transect lines in WL
survey area
Table 5.2 Co-ordinates of underwater noise
monitoring stations
Table 5.3 Summary of Land-based of Dolphin
Behaviour and Movement Monitoring Requirements
Table 5.4 Major Construction Program for Contract
No. HY/ 2011/09
Table 8.1 Major
Dust Sources during the Monitoring in the Reporting Period
Table 8.2Major
Noise Sources during the Monitoring in the Reporting Period
Table 8.3
Comparison of 1-hr TSP Data with EIA predictions and Baseline Monitoring
Results
Table 8.4
Comparison of 24-hr TSP Data with EIA predictions and Baseline Monitoring
Results
Table 8.5
Comparison of Noise Monitoring Data with EIA predictions and Baseline
Monitoring Results
LIST OF
FIGURE
Figure
2 Project
Organisation for Environmental Works
Figure
3 Locations
of Air Quality, Noise and Wind Monitoring Stations
Figure 4 Locations
of Water Quality Monitoring Stations
Figure 5 Locations
of Underwater Noise Monitoring Stations
Figure
6 Locations
of Land-based Dolphin Behavior and Movement Monitoring Stations
Figure
7 Transect
Line Layout in West Lantau Survey Areas
LIST OF
APPENDICES
Appendix
C Summary of
Environmental Mitigation Implementation Schedule (EMIS)
Appendix F Summary of Prosecutions
Appendix
G Summary of Exceedance
Appendix
H Post-Construction Water
Quality Monitoring Report