TABLE OF CONTENTS
Introduction
Environmental
Monitoring and Audit Progress
Complaint
Log
Future
Key Issues
Purpose
of the report
Structure
of the report
Background
Contract
Organisation
Construction
Programme
Summary
of Construction Works Undertaken During Reporting Month
Status
of Environmental Licences, Notification and Permits
Monitoring
Requirements
Monitoring
Location
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedure
1-hour
and 24-hour TSP Air Quality Monitoring
Instrumentation
HVS
Installation
Filters
Preparation
Operating/Analytical
Procedures
Results
and Observations
Event
and Action Plan
Monitoring
Requirements
Monitoring
Location
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedures
Maintenance
and Calibration
Results
and Observations
Event
and Action Plan
Monitoring
Requirements
Monitoring
Locations
Monitoring
Equipment
Monitoring
Parameters, Frequency
Monitoring
Methodology
Instrumentation
Operating/Analytical
Procedures
Laboratory
Analytical Methods
QA/QC
Requirements
Maintenance
and Calibration
Results
and Observations
Event
and Action Plan
Monitoring
Requirements
DOLPHIN
MONITORING (LINE-TRANSECT VESSEL SURVEY)
Monitoring
Requirements
Monitoring
Location
Monitoring
Frequency
Monitoring
Results
LAND-BASED
DOLPHIN BEHAVIOUR AND MOVEMENT MONITORING AFTER BRIDGE CONSTRUCTION
Construction
Program and Monitoring Period
ADDITIONAL
LAND-BASED DOLPHIN BEHAVIOUR AND MOVEMENT MONITORING
7 ENVIRONMENTAL
SITE INSPECTION
Site
Audits
Implementation
Status of Environmental Mitigation Measures
Advice
on the Solid and Liquid Waste Management Status
8 ENVIRONMENTAL
NON-CONFORMANCE (EXCEEDANCES)
Summary
of Exceedances
Summary
of Notification of Summons and Successful Prosecution
Key
Issues in the Coming Month
Construction
Programme for the Next Month
LIST OF TABLES
Table 2.1 Key
Contacts of the Contract
Table 2.2 Status
of Environmental Licences, Notification and Permits
Table 3.1 Location
for Air Quality Monitoring Locations
Table 3.2 Air
Quality Monitoring Equipment
Table 3.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 4.1 Location
for Noise Monitoring Locations
Table 4.2 Noise
Monitoring Equipment
Table 4.3 Noise
Monitoring Parameters, Frequency and Duration
Table 5.1 Location
for Marine Water Quality Monitoring Locations
Table 5.2 Water
Quality Monitoring Equipment
Table 5.3 Water
Quality Monitoring Parameters and Frequency
Table 5.4 Methods
for Laboratory Analysis for Water Samples
Table 5.5 Summary
of Post-Construction Water Quality Monitoring Results
Table 6.1 Co-ordinates
of transect lines in WL survey area
Table 6.2 Summary
of Land-based of Dolphin Behaviour and Movement Monitoring Requirements
Table 6.3 Major
Construction Program for Contract No. HY/ 2011/09
LIST OF FIGURE
Figure 2 Project
Organisation for Environmental Works
Figure 3 Locations
of Air Quality, Noise and Wind Monitoring Stations
Figure 4 Locations
of Water Quality Monitoring Stations
LIST OF APPENDICES
Appendix A Construction Programme
Appendix B Action
and Limit Levels
Appendix D Summary
of Exceedance
Appendix E Updated
Environmental Mitigation Implementation Schedule
Appendix F Waste Generation in the Reporting Month
Appendix H Summary of Successful
Prosecutions
Appendix I Post-Construction
Water Quality Monitoring Report
Appendix J Post-Construction Dolphin Monitoring
Report (Line-transect)