TABLE OF CONTENTS
Introduction
Environmental
Monitoring and Audit Progress
Breaches of Action
and Limit Levels
Future Key Issues
Purpose of the
report
Structure of the
report
Background
Contract Organisation
Construction Programme
Summary of
Construction Works Undertaken During Reporting Period
Status of
Environmental Licences, Notification and Permits
3 ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
Monitoring
Parameters and Monitoring Locations
Monitoring
Methodology and Calibration Details
Environmental
Quality Performance Limits (Action and Limit Levels)
Event and Action
Plan
Implementation
Status of Environmental Mitigation Measures
Site Audit Summary
Status of Waste
Management
4 ENVIRONMENTAL
MONITORING RESULTS
Air Quality
Monitoring Results
Noise Monitoring
Results
Water Quality
Monitoring Results
Dolphin Monitoring
(Line-transect Vessel Survey)
Land-based Dolphin
Behaviour and Movement Monitoring after bridge
construction
Construction
Program and Monitoring Period
5 ENVIRONMENTAL
NON-CONFORMANCE (EXCEEDANCES)
Summary of
Exceedances
Summary of
Environmental Complaint
Summary of
Notification of Summons and Successful Prosecution
LIST OF TABLES
Table I Summary
Table for Monitoring Activities in the Reporting Period
Table II Summary Table for Events Recorded in the
Reporting Period
Table 2.1 Key Contacts of
the Contract
Table 3.1 Summary of Impact
EM&A Requirements
Table 3.2a Action and Limit Levels for
1-Hour TSP
Table 3.2b Action and Limit Levels for
24-Hour TSP
Table 3.2c Action and Limit Levels for
Construction Noise
Table 3.2d Action and Limit Levels for
Water Quality
Table 3.2e Action
and Limit Levels for Dolphin Line Transect Monitoring
Table 4.1 Summary Table of
1-hour TSP Monitoring Results during the Reporting Period
Table 4.2 Summary Table of
24-hour TSP Monitoring Results during the Reporting Period
Table 4.3 Observation at
Dust Monitoring Stations
Table 4.4 Summary Table of
Noise Monitoring Results during the Reporting Period
Table 4.5 Observation at
Noise Monitoring Stations
Table 4.9 Summary
of Land-based of Dolphin Behaviour and Movement Monitoring Requirements
Table 4.10 Major
Construction Program for Contract No. HY/ 2011/09
LIST OF FIGURE
Figure 2 Project
Organisation for Environmental Works
Figure 3 Locations
of Air Quality, Noise and Wind Monitoring Stations
Figure 4 Locations
of Water Quality Monitoring Stations
LIST OF APPENDICES
Appendix A Construction Programme
Appendix B Graphical Presentation of 1-hour TSP Monitoring
Results
Appendix C Graphical Presentation of 24-hour TSP Monitoring Results
Appendix D Graphical
Presentation of Noise Monitoring Results
Appendix E Graphical
Presentation of Water Quality Monitoring Results
Appendix
F Dolphin
Monitoring Report (Line Transect)
Appendix H Updated
Environmental Mitigation Implementation Schedule
Appendix J Waste
Generation in the Reporting Month
Appendix K Summary
of Exceedance
Appendix M Summary of Successful
Prosecutions