Environmental Permits (EPs) Submissions

For HZMB HKLR

For HZMB HKBCF

For TM-CLKL


For HZMB HKLR

No. EP Condition No. Title of Submission Project Contract HTML PDF
1 EP-352/2009 2.3 Setting Up of ENPO ALL - pdf
2 EP-352/2009/D 2.5 Dolphin Watching Plan HKLR HY/2011/03 html pdf
3 EP-352/2009/A 2.5 Dolphin Watching Plan HKLR HY/2011/09 html pdf
4 EP-352/2009/A 2.6 Acoustic Decoupling Measure Plan HKLR HY/2011/03 html pdf
5 EP-352/2009/A 2.6 Acoustic Decoupling Measure Plan HKLR HY/2011/09 html pdf
6 EP-352/2009/A 2.7 Coral Translocation Methodology HKLR HY/2011/03 html pdf
7 EP-352/2009/A 2.8 Spill Response Plan HKLR HY/2011/03 html pdf
8 EP-352/2009/C 2.8 Spill Response Plan HKLR HY/2011/09 html pdf
9 EP-352/2009/D 2.9 Regular Marine Travel Routes Plan HKLR HY/2011/03 html pdf
10 EP-352/2009/C 2.9 Regular Marine Travel Routes Plan HKLR HY/2011/09 html pdf
11 EP-352/2009/A 2.10 Emergency Response Plan HKLR HY/2011/03 html pdf
12 EP-352/2009/C 2.10 Emergency Response Plan HKLR HY/2011/09 html pdf
13 EP-352/2009/D 2.11 Landscape and Visual Plan HKLR HY/2011/03 html pdf
14 EP-352/2009/A 2.11 Landscape and Visual Plan HKLR HY/2011/09 html pdf
15 EP-352/2009/A 2.12 Waste Management Plan HKLR HY/2011/03 html pdf
16 EP-352/2009/C 2.12 Waste Management Plan HKLR HY/2011/09 html pdf
17 EP-352/2009/D 3.16 Emergency Response Plan for Spillage of Oil and Chemicals (Operation Phase) HKLR _ - pdf
18 EP-352/2009/A 4.1 Proposal for Enhanced Event and Action Plan for Chinese White Dolphin Monitoring HKLR HY/2011/03 - pdf
19 EP-352/2009/A 4.1 Proposal for Enhanced Event and Action Plan for Chinese White Dolphin Monitoring HKLR HY/2011/09 - pdf
20 EP-352/2009/A 4.3 Baseline Monitoring Report HKLR HY/2011/03 html pdf
21 EP-352/2009/A 4.3 Baseline Monitoring Report HKLR HY/2011/09 html pdf

 

Top

Notes:
1. The submission list was updated on 11 Oct 2021.
2. Submissions were made by the respective Environmental Team of the construction contract listed above.
3. Submissions not declared under a specific contract were made by Highways Department.
4. If an EP condition is relevant to more than one contract, the ET for each contract will made its own submission for the relevant part of works.


For HZMB HKBCF

No. EP Condition No. Title of Submission Project Contract HTML PDF
1 EP-353/2009/C 2.5 Brothers Islands Marine Park Proposal HKBCF - pdf
2 EP-353/2009/D 2.6 Dolphin Watching Plan HKBCF HY/2010/02 html pdf
3 EP-353/2009/K 2.6 Dolphin Watching Plan HKBCF HY/2013/01 html pdf
4 EP-353/2009/K 2.6 Dolphin Watching Plan HKBCF HY/2013/02 html pdf
5 EP-353/2009/K 2.6 Dolphin Watching Plan HKBCF HY/2013/03 html pdf
6 EP-353/2009/K 2.6 Dolphin Watching Plan HKBCF HY/2013/04 html pdf
7 EP-353/2009/D 2.7 Spill Response Plan HKBCF HY/2010/02 html pdf
8 EP-353/2009/D 2.7 Spill Response Plan HKLR HY/2011/03 html pdf
9 EP-353/2009/G 2.7 Spill Response Plan HKBCF HY/2013/01 html pdf
10 EP-353/2009/J 2.7 Spill Response Plan HKBCF HY/2013/02 html pdf
11 EP-353/2009/H 2.7 Spill Response Plan HKBCF HY/2013/03 html pdf
12 EP-353/2009/H 2.7 Spill Response Plan HKBCF HY/2013/04 html pdf
13 EP-353/2009/J 2.7 Spill Response Plan HKBCF HY/2014/05 html pdf
14 EP-353/2009/K 2.7 Spill Response Plan HKBCF HY/2019/01 html pdf
15 EP-353/2009/D 2.8 Regular Marine Travel Routes Plan HKBCF HY/2010/02 html pdf
16 EP-353/2009/K 2.8 Regular Marine Travel Routes Plan HKBCF HY/2013/01 html pdf
17 EP-353/2009/K 2.8 Regular Marine Travel Routes Plan HKBCF HY/2013/02 html pdf
18 EP-353/2009/K 2.8 Regular Marine Travel Routes Plan HKBCF HY/2013/03 html pdf
19 EP-353/2009/K 2.8 Regular Marine Travel Routes Plan HKBCF HY/2013/04 html pdf
20 EP-353/2009/K 2.9 Landscape and Visual Plan HKBCF _ html pdf
21 EP-353/2009/D 2.10 Waste Management Plan HKBCF HY/2010/02 html pdf
22 EP-353/2009/H 2.10 Waste Management Plan HKBCF HY/2013/01 html pdf
23 EP-353/2009/K 2.10 Waste Management Plan HKBCF HY/2013/02 html pdf
24 EP-353/2009/I 2.10 Waste Management Plan HKBCF HY/2013/03 html pdf
25 EP-353/2009/I 2.10 Waste Management Plan HKBCF HY/2013/04 html pdf
26 EP-353/2009/I 2.10 Waste Management Plan HKBCF HY/2014/05 html pdf
27 EP-353/2009/K 2.10 Waste Management Plan HKBCF HY/2019/01 html pdf
28 EP-353/2009/B 2.11 Setting Up of ENPO ALL - pdf
29 EP-353/2009/K 4.1 Emergency Response Plan for Spillage of Oil and Chemicals (Operation Phase) HKBCF _ html pdf
30 EP-353/2009/F 5.1 Proposal for Enhanced Event and Action Plan for Chinese White Dolphin Monitoring HKBCF HY/2010/02 - pdf
31 EP-353/2009/D 5.3 Baseline Monitoring Report HKBCF HY/2010/02 - pdf
32 EP-353/2009/E 5.3 Baseline Monitoring Report HKLR HY/2011/03 html pdf

 

Top

Notes:
1. The submission list was updated on 09 Nov 2021.
2. Submissions were made by the respective Environmental Team of the construction contract listed above.
3. Submissions not declared under a specific contract were made by Highways Department.
4. If an EP condition is relevant to more than one contract, the ET for each contract will made its own submission for the relevant part of works.


For TM-CLKL

No. EP Condition No. Title of Submission Project Contract HTML PDF
1 EP-354/2009/A 2.4 Enhanced TSP Monitoring Plan TMCLKL HY/2012/08 html pdf
2 EP-354/2009/A 2.5 Acoustic Decoupling Measure Plan TMCLKL HY/2012/07 html pdf
3 EP-354/2009/A 2.5 Acoustic Decoupling Measure Plan TMCLKL HY/2012/08 html pdf
4 EP-354/2009/A 2.6 Detailed Coral Translocation Methodology TMCLKL HY/2012/07 html pdf
5 EP-354/2009/A 2.6 Detailed Coral Translocation Methodology TMCLKL HY/2012/08 html pdf
6 EP-354/2009/A 2.7 Spill Response Plan TMCLKL HY/2012/08 html pdf
7 EP-354/2009/A 2.7 Spill Response Plan TMCLKL HY/2012/07 html pdf
8 EP-354/2009/A 2.7 Spill Response Plan HKBCF HY/2010/02 html pdf
9 EP-354/2009/A 2.8 Regular Marine Travel Routes Plan TMCLKL HY/2012/08 html pdf
10 EP-354/2009/A 2.8 Regular Marine Travel Routes Plan TMCLKL HY/2012/07 html pdf
11 EP-354/2009/A 2.8 Regular Marine Travel Routes Plan HKBCF HY/2010/02 html pdf
12 EP-354/2009/A 2.10 Waste Management Plan HKBCF HY/2010/02 html pdf
13 EP-354/2009/A 2.10 Waste Management Plan TMCLKL HY/2012/07 html pdf
14 EP-354/2009/A 2.12 Setting Up of ENPO ALL - pdf
15 EP-354/2009/A 4.3 Baseline Monitoring Report HKBCF HY/2010/02 - pdf
16 EP-354/2009/A 4.3 Baseline Monitoring Report TMCLKL HY/2012/08 html pdf
17 EP-354/2009/A 4.3 Baseline Monitoring Report TMCLKL HY/2013/12 html pdf
18 EP-354/2009/B 2.10 Waste Management Plan TMCLKL HY/2012/08 html pdf
19 EP-354/2009/B 3.5 Notification of Changes in Construction Sequence TMCLKL HY/2012/08 html pdf
20 EP-354/2009/B 3.5 Notification of Changes in Construction Sequence TMCLKL HY/2012/07 html pdf
21 EP-354/2009/B 4.3 Baseline Monitoring Report TMCLKL HY/2012/07 html pdf
22 EP-354/2009/D 2.9 Landscape and Visual Plan TMCLKL All html pdf
23 EP-354/2009/D 2.10 Waste Management Plan TMCLKL HY/2013/12 html pdf
24 EP-354/2009/D 2.10 Waste Management Plan TMCLKL HY/2017/10 html pdf
25 EP-354/2009/D 3.17 Emergency Response Plan for Spillage of Oil and Chemicals (Operation Phase) TMCLKL HY/2012/07 - pdf
26 EP-354/2009/D 3.17 Emergency Response Plan for Spillage of Oil and Chemicals (Operation Phase) TMCLKL HY/2012/08 - pdf

 

Top

Notes:
1. The submission list was updated on 09 Nov 2021.
2. Submissions were made by the respective Environmental Team (ET) of the construction contract listed above.
3. Submissions not declared under a specific contract were made by Highways Department.
4. If an EP condition is relevant to more than one contract, the ET for each contract will made its own submission for the relevant part of works.

This page is generated at: 11:00am, 9th October 2022.